Medical equipment installation and activation phase is the final phase of new healthcare construction and renovation projects. Even in this late stage, there are challenges that can derail a budget if they aren’t avoided. For instance, if
equipment doesn’t arrive on time, or doesn’t fully meet the needs of your facility, it could delay the opening date, costing millions in lost revenue each day.
Patient safety and satisfaction are also at stake. How can clinicians provide the highest level of care to their patients if they don’t have all the necessary equipment and tools, placed exactly where they need them?
All projects will encounter equipment issues of some kind. Having a plan in place to quickly communicate, address, and resolve the problem can help mitigate disruptions to the project schedule.
The entire activation team should be included on a trial-run of the move process, during which the team will create and step through routes for moving the equipment. This will ensure that your team has adequate access to the receiving dock (or wherever the equipment has been delivered), elevators, and anything else needed to move the equipment to its final location.
For projects operating in facilities that are already open or partially open, the mock move also gives the team a chance to validate that their routes take the equipment through the fastest and least disruptive pathways. If a building is open to patients at any point during the installation, the move team will have to set up restrictions to keep patients and staff away from dangerous areas.
The equipment planner is responsible for coordinating any equipment received at the dock. This includes notifying the dock team that the delivery is coming, and making sure the team knows who is responsible for retrieving the equipment.
Also, make sure you are aware of the rules of the dock. The dock likely has a rule that deliveries can’t sit at the dock for more than 24 hours, or overnight. Have a plan — and people — in place to promptly relocate any equipment off of the dock to its appropriate location.
Attainia from Revalize is a powerful equipment planning platform that makes this process easy.
With Attainia equipment planners can:
Attainia from Revalize is an industry-leading medical equipment installation planning platform that supports the nation’s top healthcare, architecture, engineering, and design organizations through all phases of the medical equipment planning process. If you’d like to assess if Attainia is the best choice for your organization.