Text in bold, stylized font reads PULP on the left and PIXEL on the right, separated by a vertical gray line—a sleek design reminiscent of cutting-edge healthcare project management software.
PROJECT is a collaborative, cloud-based application that streamlines and accelerates medical equipment planning

PROJECT Connects and Transforms

Whether your medical equipment planning project is new construction, expansion or renovation, automating and streamlining the process with PROJECT helps you get projects completed on time and on budget.

Hundreds of pre-built department and room templates, an integrated equipment catalog, and an intuitive and fast collaborative environment allows PROJECT to drive efficiencies that reduce equipment planning time by as much as 75%.

PROJECT delivers comprehensive, interactive equipment lists that include MEP specifications and connectivity requirements utilizing the Attainia INTEGRATED EQUIPMENT CATALOG. Architects and general contractors can easily identify the MEP needs for every location based on the equipment lists. PROJECT also generates reports and project data exports.

3D Surgery room

Seamless Revit Integration

Attainia’s Revit Integration synchronizes project data between PLAN-IT Project and Autodesk Revit. Automate updates and ensure precise equipment placement within Revit designs. Enhance design accuracy and streamline your planning process for more efficient and effective project management.

Powerful Open API

Leverage Attainia’s Open API for seamless data integration with third-party systems. Pull data from Attainia into ERP systems for PO management or BI tools for comprehensive reporting. The API is the backbone of Attainia integrations, ensuring your project data is always up-to-date and easily accessible.

No More Spreadsheets

Using spreadsheets for equipment planning slows down the work, creates inefficiencies, makes collaboration very difficult, and leaves room for error. Cloud-based PROJECT drives cross-functional collaboration and provides guidance for standards offering maximum GPO contract utilization … something spreadsheets cannot do.

The Ultimate Collaborative Experience

Attainia’s cloud-based environment bring all stakeholders together — including remote teams — supporting real-time communication and better decision making. As the single source of truth and as a historical repository, all data is stored within the platform instead of spreadsheets or saved on a local server — or worse, in the minds of one or two individuals.

Spending Visibility to Leverage Savings

Enhance your procurement strategy by aggregating data across projects for better visibility into spend, volume, and areas to reduce costs. With access to the most qualified vendors and products and the opportunity to strengthen supplier relationships through improved communication, healthcare systems can collaborate with vendors to negotiate better pricing for premium products, ultimately improving quality while saving on costs.

Easily Enforce Equipment Standards

Attainia ensures standards visibility as a single point of truth for all stakeholders. PROJECT’s room templates allows organizations to create and share standards. Standards and equipment-under-contract are also easily flagged in the INTEGRATED EQUIPMENT CATALOG, so they can be specified during the planning process.
Attalinia Plan It screenshot

Industry-Leading Equipment Catalog

Attainia makes specifying new equipment easy with our INTEGRATED EQUIPMENT CATALOG of more than 66,000 FF&E products from more than 3,400 suppliers. Planners have quick, in-platform access to product spec sheets, images, list price, MEP data and more – without leaving the PROJECT application.

Take a Deep Dive Into Medical Equipment Catalog

Pre-Built Room Templates

Choose from more than 1,800 templates to help jump-start your project planning. Each template provides an unspecified equipment list and preliminary budget – so there’s no need to reinvent the wheel for each new project. Templates can also be used to create and drive standards within your organization.
Pointing at blueprints

Testimonials

The ability to add our organization pricing to projects saved so much time and provided our finance department a more accurate budget estimate. Attainia analytics will help our sourcing managers negotiate strategic relationships with our suppliers by utilizing our volume and estimated spend appropriately. The new PLAN-IT | PROJECT platform allowed us to save days or even weeks in planning time!”

Steven Isakson

Facility Equipment Planner, Intermountain Healthcare

Connect With Us

Ready to drive business transformation?